Villa Aluminium Windows Specification Checklist Before Ordering

Most problems with villa windows and doors start before fabrication, with missing information or late decisions. This checklist sets out what consultants and owners should confirm before placing an order.

Villa Aluminium Windows Specification Checklist Before Ordering

Why a Checklist Before Ordering

Aluminium windows and doors are made to measure. Once profiles are cut and glass is ordered, changes become expensive and slow. Whether you are building a villa in Muscat, Salalah, Dubai or Abu Dhabi, a clear specification protects the budget, the programme and the final quality. Use the sections below in order; each depends on the one before it.

1. Drawings and the Opening Schedule

Start with coordinated architectural drawings: plans, elevations and sections that show every opening. From these, prepare an opening schedule, a single table listing each window and door with:

The schedule becomes the reference for quotation, shop drawings and site measurement, so keep it updated with revision numbers.

2. Performance Targets

Define what each opening must achieve rather than only how it looks:

Ask suppliers to state catalogue ratings for each system and to confirm suitability for your sizes. For example, Alminyar's S11 window is catalogued at air tightness Level 7 and wind resistance Level 9, with about 35 dB sound insulation.

3. Glass

Specify the full glass make-up, not just "double glazing":

4. Hardware

Hardware decides how a window feels every day. Confirm:

5. Finishes

6. Samples and Mock-Ups

Request a corner sample of the profile with finish, a glass sample and hardware samples. For larger villas, a full-size sample window installed on site is the best way to confirm appearance and operation before mass production.

7. Shop Drawings

Shop drawings translate the design into fabrication details. Review them for:

Do not release fabrication until shop drawings are approved in writing by the consultant and owner.

8. Site Measurement

Final dimensions should come from site measurement of finished openings, not only from drawings. Openings must be complete, plastered or ready for cladding, with finished floor levels established so thresholds are correct.

9. Installation

Agree the installation method statement in advance: fixing type and spacing, perimeter sealant, protection of finished profiles and glass, and the sequence with other trades such as plastering, painting and flooring.

10. Handover and Snagging

At handover, inspect every opening against the schedule. Check operation, locking, alignment, gaskets, glass for scratches or chips, sealant lines and finish damage. Record snags with photographs and agreed completion dates. Collect operation and maintenance guidance and warranty documents.

Printable Checklist

#ItemResponsibleStatus
1Coordinated drawings issuedArchitect / consultant☐
2Opening schedule complete with referencesConsultant☐
3Performance targets defined per roomConsultant☐
4Glass make-up and safety glass confirmedConsultant / supplier☐
5Hardware brand, handles and locks approvedOwner / consultant☐
6Finish and colour approved on sampleOwner☐
7Profile, glass and hardware samples approvedOwner / consultant☐
8Shop drawings approved in writingConsultant☐
9Site measurement of finished openingsSupplier☐
10Installation method statement agreedContractor / supplier☐
11Snagging inspection completedConsultant / owner☐
12Warranty and maintenance documents receivedOwner☐

Alminyar Recommendation

Share your drawings and opening schedule with us as early as possible, ideally before finishes and hardware are fixed. Alminyar can review the schedule, suggest suitable systems for each opening, prepare shop drawings and carry out site measurement, so that what is ordered matches what is built.