Receiving your aluminium windows and doors at home

Use this checklist on handover day, before you sign anything. Walk every room with the installer, test every opening yourself and write down every defect. It is far easier to fix a problem before sign-off than after the final payment.

Villa owners, site engineers, consultants32 items90 min

Progress 0/32· 11 must-check items left

Share

1Delivery inspection

2Frames and finish

3Glass

4Operation and hardware

5Weather sealing and installation

6Documents, snag list and sign-off