Site readiness before installation
Most installation delays and defects start with a site that was not ready. Go through this list with the contractor a week or two before the installation team arrives.
Site engineers, contractors, villa owners26 items60 min
Progress 0/26· 10 must-check items left
1Openings
2Finishes, sills and levels
3Structure and fixings
4Access, power and storage
5Protection and coordination
6Final site measurement