Site readiness before installation

Most installation delays and defects start with a site that was not ready. Go through this list with the contractor a week or two before the installation team arrives.

Site engineers, contractors, villa owners26 items60 min

Progress 0/26· 10 must-check items left

Share

1Openings

2Finishes, sills and levels

3Structure and fixings

4Access, power and storage

5Protection and coordination

6Final site measurement